To meet the strict requirements of various projects, to ensure the safety of the project, for you to avoid worries!

Fabrication method of steel pipe fastener scaffold


Release time:

2022-02-10

At present, the construction of steel pipe fastener scaffolding is generally used to fasten the cross for two pairs of cross button arc fasteners and constitute. The fastener can only be used to rotate the bolt with a wrench to complete the fixation and disassembly of the scaffold steel pipe connection point, which is time-consuming and low in construction efficiency. In addition, the threaded part of the fastener fastened on the bolt is easily damaged by the impact of other objects. In addition, because the bracket for construction generally works outdoors, the threaded part of the bolt is easy to rust and damage, which further affects the use performance of the bolt fastening fastener and reduces the life of the fastener.

At present, the construction of steel pipe fastener scaffolding is generally used to fasten the cross for two pairs of cross button arc fasteners and constitute. The fastener can only be used to rotate the bolt with a wrench to complete the fixation and disassembly of the scaffold steel pipe connection point, which is time-consuming and low in construction efficiency. In addition, the threaded part of the fastener fastened on the bolt is easily damaged by the impact of other objects. In addition, since the construction bracket generally works outdoors, the threaded part of the bolt is easily rusted and damaged, which further affects the service performance of the bolt fastening fastener and reduces the service life of the fastener. Then, let's learn about the manufacturing method of the steel pipe fastener scaffold together!

The purpose of the steel pipe fastener scaffold is to provide a steel pipe scaffold fastener that is convenient to use, easy to operate, and can effectively improve the performance of the fastener, increase the life of the fastener and the construction efficiency.

The technical means for achieving the above purpose is to have a pair of horizontal tube hooks arranged in parallel, to set an arc-shaped hook body at the front of the hook, to set a flat pin hole plate with a rectangular pin hole in the center near the rear between the two hooks, and to form a vertical U-shaped plate continuously with the flat pin hole plate.

The front inner hook surface of the steel pipe fastener scaffold is arranged on the arc surface, and the front of the arc-shaped longitudinal pipe locking plate is arranged on the arc concave surface.

The utility model has simple structure, convenient processing and forming, convenient use, and saves operation trouble, which can effectively improve the use performance of fasteners and improve the life and construction efficiency of fasteners.

The steel pipe fastener scaffold has a vertical u-shaped plate 4 connected to the pin hole plate 2, the front end of the u-shaped plate 4 is provided with an arc-shaped pipe clamp 3 =, and a wedge-shaped locking pin is installed in the pin hole of the pin hole plate 2. The front inner hook surface of the example hook 1 is arranged on a circular arc surface, and the front surface of the circular arc-shaped pipe clamp 3 is arranged on a circular arc concave surface.

When using the utility model, the steel pipe fastener scaffold uses the two hook l-shaped hooks on the horizontal tube of the bracket, aligns the arc concave surface of the arc-shaped longitudinal tube clamping plate 3 with the longitudinal tube, connects the horizontal and vertical two bracket steel pipes cross, knocks the upper end surface of the wedge-shaped clamping pin 5 with a hammer to clamp the two cross steel pipes, thus realizing the horizontal and vertical disassembly of the steel pipe bracket, simply tap the wedge lock pin 5 with a hammer from below to remove the fastener and complete the disassembly of the steel pipe joint.

Claim

The steel pipe fastener scaffold is provided with a pair of horizontal pipe hooks arranged in parallel. An arc-shaped hook body is arranged at the front of the hook. A flat pin orifice plate with a rectangular pin hole in the center is arranged near the rear between the two hooks. The flat pin orifice plate continuously forms a vertical U-shaped plate. An arc-shaped longitudinal plate is arranged at the front of the U-shaped plate.

The steel pipe fastener scaffold is characterized in that the front inner hook surface of the hook is arranged on the arc surface, and the front of the arc-shaped vertical pipe locking plate is arranged on the arc concave surface. The utility model has a pair of horizontal tube hooks arranged in parallel, the front part of which is arranged on the arc-shaped hook body, and a flat pin orifice plate with a rectangular pin hole in the center is arranged near the rear part between the two hooks, and the flat pin orifice plate continuously forms a vertical U-shaped tube. The utility model has simple structure, convenient use, saved operation trouble, and can effectively improve the use performance of fasteners, improve fastener life and construction efficiency.

The above introduction is the production method of steel pipe fastener scaffold, if you need to know more, you can contact us at any time!

Key words:

Steel pipe fastener